|
Contents:
2-Swaybar arms
2-flanged bushings
2-straight bushings
1-crosslink
2-assembled tie rod links
2-3x16mm button hex screws (attaching to bulkheads)
2-3x6mm button head screws (attaching crosslink to swaybars)
2-3x10mm button hex screws (attaching tie rods to swaybars)
2-3x12mm flat hex screws (attaching tie rods to lower arms)
4-3mm washers (to hold and support bushings)
1-2mm Allen key
Note: Make sure to remove two of the four screws holding the
shock tower onto the bulkheads (first picture). This is where the flanged
bushings sit. To prevent parts from coming loose and getting lost make sure
to use loctite on all screws that thread into metal.
MAKE SURE TO USE LOCTITE ON ALL METAL THREADS!!!
We now offer a hardware replacement kit for
our swaybars. Looks like a few customers are still not using loctite
when installing this product. The hardware kit includes all screws,
bushings and the center link as is available on the Swaybars page. |